When working with wall sections and plan details, it would be a benefit to be able to open multiple GTVs at a time...for reference to the new drawing being created.
An example would be to be able to open the front elevation and the wall sections that are cut from the elevation. It would save time to not have to go to the layer menu to turn them on and off to get the "working view" needed.[/b]
An example would be to be able to open the front elevation and the wall sections that are cut from the elevation. It would save time to not have to go to the layer menu to turn them on and off to get the "working view" needed.[/b]