I have asked this before, but received no replies. Sometimes, when I go back into O2C after making a change in the drawing, The material assignments get all messed up. I have found 2 ways to fix it------just identify each entity that has changed, or close the drawing, and re-open it. Not a major problem, but really annoying. Has anyone else experienced this problem?
Thanks,
Bob
Thanks,
Bob