For those who are doing work in California:
Going through my first project of needing to provide the documentation for CALGreen and not really getting exactly what type of documentation I'm needing to include within the drawings. Does anyone have some suggestions or checklists they'd allow me to borrow? Some of it seems like a no-brainer, but how to DOCUMENT and VERIFY it within the plans is giving me headaches!
Thanks!
Going through my first project of needing to provide the documentation for CALGreen and not really getting exactly what type of documentation I'm needing to include within the drawings. Does anyone have some suggestions or checklists they'd allow me to borrow? Some of it seems like a no-brainer, but how to DOCUMENT and VERIFY it within the plans is giving me headaches!
Thanks!
Highest Regards,
Alan T. Hendry, RA
Intel i7-12700F (2.10 GHz) Desktop, 16GB RAM, 1TB SSD, Win 11 Home 64-bit, DC 23 w/ latest beta
Intel i7-10750H (2.6GHz) Laptop, 16GB RAM, 1.5TB HD, Win 11 Home 64-Bit, w/ DC 22, 23 & latest beta
Alan T. Hendry, RA
Intel i7-12700F (2.10 GHz) Desktop, 16GB RAM, 1TB SSD, Win 11 Home 64-bit, DC 23 w/ latest beta
Intel i7-10750H (2.6GHz) Laptop, 16GB RAM, 1.5TB HD, Win 11 Home 64-Bit, w/ DC 22, 23 & latest beta